Then we spent Christmas with the folks, and P discovered an envelope of pictures we had sent his mom when we put a bid in on the place. My, it was nearly unrecognizable! (Well, not quite--not nearly so much as it will be when we're finally done with the place. :-) ) It served as an excellent reminder of how much we really have accomplished this year.
Especially considering that for us, the year had only nine months: we closed on our house March 31.
So, without further delay, what you've all been waiting for: the pictures!
Guest Bedroom
Before:
- removed carpet
- refinished flooring
- repaired drywall
- painted ceiling, trim, walls, and door
- replaced door knob
- removed sliding closet doors
- installed new baseboard and quarter-round
- hung curtains
Office
Before:
- removed carpet
- refinished flooring
- repaired drywall
- painted ceiling, trim, and walls
- removed sliding closet doors
- installed new baseboard and quarter-round
Hall
Before:
- removed doors to dining room and living room to open up floor plan
- removed carpet
- refinished flooring
- stripped wallpaper
- skim coated drywall
- painted ceiling, trim, walls, and doors
- replaced door knobs
- butchered newly painted attic hatch
- installed new baseboard and quarter-round
- installed new closet shelving
Hall Bath
Before:
- stripped wallpaper
- replaced light fixture
- replaced exhaust fan
- replaced toiled
- skim coated
- painted ceiling, trim, walls, and doors
- replaced door knobs
- installed closet shelving
Before:
- removed carpet
- refinished floors
- knocked hole in the wall with floor buffer
- filled it with boxes and used it as a storage locker
Yeah, not nearly ready to go there yet.
Kitchen
Before:
- bought refrigerator
- bought washer and dryer
- painted countertops
- painted panelling, walls, and trim
Dining Room
Before:
- removed carpet
- refinished existing hardwoods in half of room, lived on subfloor in other half
- painted panelling, trim, and built-ins
- removed coal stove
- removed stove pipe
- installed chimney balloon
Master Bedroom
Before:
- removed carpet
- lived on subfloor
- removed TV shelf
- patched drywall
- painted walls
- painted faux headboard
- hung curtains
- hung vacation photos
- reupholstered thrift store chair
Master Bath
Before:
- threw away icky carpet remnant
- discovered water damage to floor
- stomped through floor
- repaired rotting subfloor
- hung new drywall and ceiling in closet
- laid new laminate flooring
- painted ceiling and walls
- hung shelves in closet
- spray painted yellowing fan
- hung NYC map poster
After:
Attic
not very photogenic. P spent a good bit of time up there laying down planking so he could work on wiring, etc., without worrying about falling through the ceiling
Crawl Space
P will have creepy crawly pictures for you at some later date. But he's been busy down there.
- removed a surprising amount of random junk that every tradesman who's been in there since 1975 must have contributed to
- repaired some leaking plumbing
- encapsulated 1/3 of crawl space
- removed old shelving
- started organizing space to work for us
- removed wheelchair ramp to side entrance, uncovering existing stairs
- removed dead azaleas (and some live ones)
- planted new plants
- had good herb garden and a bumper crop of sweet peppers
- painted stairs
- replaced furnace
- planted chaste tree to shade A/C unit, and swamp magnolia just for fun
- installed new mailbox
- created new planting beds around mailbox and furnace/A/C unit
What a (9 month) year! Next time: our 2011 to-do list!